Skip to main content

Pentagon Apartments

The Pentagon Project is a 202-unit apartment building consisting of 205 prefabricated modular units.  The prefabricated units were manufactured at the Rise facility in Owatonna, MN and trucked to the construction site and assembled on top of a precast parking structure.  USM provided the storm piping system, domestic water, and waste & vent systems serving the amenity, common and parking areas.  We connected the pre-manufactured plumbing systems in the modules to the site installed plumbing system.

Read More

Red Lake Nation College

Red Lake Nation College is the only Tribal College in the Twin Cities.   RLNC serves Native Communities which is a unique market niche in higher education that no one else is serving.   RLNC Minneapolis will be the first Tribal College in the USA serving a major metropolitan center.  The new Minneapolis campus is a blend of old and new with a new event space link that ties together two existing historic brick buildings.

Read More

Juxtaposition Arts

Juxtaposition Arts is a teen-staffed art and design center, gallery, retail shop, and artists’ studio space in North Minneapolis.  Juxtaposition Arts develops community by engaging and employing young urban artists in hands-on education initiatives that create pathways to self-sufficiency while actualizing creative power.

Read More

MN Zoo - Russia's Grizzly Coast

  • This project consists of two different bodies of water, one salt water and the other fresh water.
  • We employed the use of Titanium heat exchangers to maintain critical water temperatures, high purity water filter system including UV and Ozone generation for sanitizing the water.
Read More

Sanford School

  • New middle school addition and building remodel
  • Project consisted of three new classrooms and remodeling three existing
Read More

Capital Cooling Tower

  • Provided maintenance on four Tower Tech Cooling Towers including:
    • Removal and replacement of tower fill media and drift eliminators
    • Cleaning and sealing of tower basins
    • Upgraded internal water piping distribution and nozzle replacement
Read More

Higher Ground

  • 7 story new Construction homeless shelter.
  • All underground piping was supported from structural concrete slab due to poor soil conditions
Read More

Edina Park Plaza

  • Providing Mechanical and Plumbing Services for the 18 story senior living facility. The upper floors of the building were occupied during the entire project.
  • The lower three levels of the building are now Memory Care units.
Read More

600 18th Ave Remodel

  • Replaced the complete waste and vent plumbing system of a 256 unit apartment unit.
  • We replace the piping from the corridor side of each unit restroom not to disturb the finishes in each unit. Each unit had functional systems at each day.
Read More

Skyline Tower

  • Remodel of a 24 story, 504 Unit apartment building in St. Paul while maintaining occupancy.
  • Replaced approximately 10 miles of waste and vent piping and water piping throughout the entire building while having plumbing system operable at the end of each day.
Read More

Webber Pool

  • The largest outdoor pool located in Minnesota and the only swimming pool in the United States that utilizes natural ponds as a method of filtering the pool water.
  • There are no chemicals added to the pool water.
Read More

Riverview Apartments

  • This project consists of a 42 unit, three story senior assisted living apartment building with underground parking.
  • Located within a couple blocks from the VA hospital, this apartment utilized A.D.A. roll-in showers, A.D.A. water closets, lavatories and kitchen sinks.
Read More

West Broadway Crescent

  • New construction of a 3 story, 54 unit apartment unit apartment complex.
  • Project was completed during the winter months without any delays to the schedule.
Read More

MAC Restroom Upgrades

  • Built (2) new large gang public restrooms and one pet relief area which contained a fire hydrant for your pets.
  • Work was coordinated during day and night hours accommodate airport operations.
Read More

5th Ave Towers

  • Occupied heating rehabilitation of 254 apartment units
  • Upgraded control valves and thermostats for finned-tube radiation.
Read More

Ravoux

  • 220 apartment units
    • New kitchen sink, lavatory faucets, stove hoods
  • Replaced all domestic water, sanitary waste and vent piping.
Read More

Hiawatha Light Rail Maintenance Facility

  • Installed 168 well ground source geothermal heating and cooling system to serve the building
  • Infrared heating system installed throughout the facility
Read More