Skip to main content

Hiawatha Light Rail Maintenance Facility

  • Installed 168 well ground source geothermal heating and cooling system to serve the building
  • Infrared heating system installed throughout the facility
  • Project consisted of a 60,200 SF building addition for allow for maintenance to the light rail trains.