Pentagon Apartments

The Pentagon Project is a 202-unit apartment building consisting of 205 prefabricated modular units.  The prefabricated units were manufactured at the Rise facility in Owatonna, MN and trucked to the construction site and assembled on top of a precast parking structure.  USM provided the storm piping system, domestic water, and waste & vent systems serving the amenity, common and parking areas.  We connected the pre-manufactured plumbing systems in the modules to the site installed plumbing system.

Read More

Higher Ground

  • 7 story new Construction homeless shelter.
  • All underground piping was supported from structural concrete slab due to poor soil conditions
Read More

Edina Park Plaza

  • Providing Mechanical and Plumbing Services for the 18 story senior living facility. The upper floors of the building were occupied during the entire project.
  • The lower three levels of the building are now Memory Care units.
Read More

600 18th Ave Remodel

  • Replaced the complete waste and vent plumbing system of a 256 unit apartment unit.
  • We replace the piping from the corridor side of each unit restroom not to disturb the finishes in each unit. Each unit had functional systems at each day.
Read More

Skyline Tower

  • Remodel of a 24 story, 504 Unit apartment building in St. Paul while maintaining occupancy.
  • Replaced approximately 10 miles of waste and vent piping and water piping throughout the entire building while having plumbing system operable at the end of each day.
Read More

Riverview Apartments

  • This project consists of a 42 unit, three story senior assisted living apartment building with underground parking.
  • Located within a couple blocks from the VA hospital, this apartment utilized A.D.A. roll-in showers, A.D.A. water closets, lavatories and kitchen sinks.
Read More

West Broadway Crescent

  • New construction of a 3 story, 54 unit apartment unit apartment complex.
  • Project was completed during the winter months without any delays to the schedule.
Read More

5th Ave Towers

  • Occupied heating rehabilitation of 254 apartment units
  • Upgraded control valves and thermostats for finned-tube radiation.
Read More

Ravoux

  • 220 apartment units
    • New kitchen sink, lavatory faucets, stove hoods
  • Replaced all domestic water, sanitary waste and vent piping.
Read More