- 7 story new Construction homeless shelter.
- All underground piping was supported from structural concrete slab due to poor soil conditions
- Tempered water provided to all plumbing fixtures via large complex mixing valve system.
- All fixtures were stainless steel penal ware installed in a vandal resistant manner