US Mechanical Projects

Higher Ground

Written by U.S. Mechanical | Feb 20, 2017 3:25:00 PM
  • 7 story new Construction homeless shelter.
  • All underground piping was supported from structural concrete slab due to poor soil conditions
  • Tempered water provided to all plumbing fixtures via large complex mixing valve system.
  • All fixtures were stainless steel penal ware installed in a vandal resistant manner