---
title: 600 18th Ave Remodel
description: The seamless replacement of waste and vent plumbing in a 256-unit apartment complex. Minimizing disruption, piping was replaced from corridor side, preserving finishes.
---

[US Mechanical Projects](https://usmech.us/projects)

# [600 18th Ave Remodel](https://usmech.us/projects/600-18th-ave-remodel)

 Written by [U.S. Mechanical](https://usmech.us/projects/author/us-mechanical) | Feb 20, 2017 5:00:00 AM

- Replaced the complete waste and vent plumbing system of a 256 unit apartment unit.
- We replace the piping from the corridor side of each unit restroom not to disturb the finishes in each unit. Each unit had functional systems at each day.
- Provided pipe lining for all underground piping.

[View full post](https://usmech.us/projects/600-18th-ave-remodel)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "U.S. Mechanical"
  },
  "dateModified" : "2023-05-15T15:11:11.570Z",
  "datePublished" : "2017-02-20T05:00:00Z",
  "headline" : "600 18th Ave Remodel",
  "image" : {
    "@type" : "ImageObject",
    "height" : 564,
    "url" : "https://39717676.fs1.hubspotusercontent-na1.net/hubfs/39717676/600-18th%20Ave%20N..jpeg",
    "width" : 1024
  },
  "mainEntityOfPage" : "https://usmech.us/projects/600-18th-ave-remodel",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "US Mechanical Projects"
  }
}
```