Provided maintenance on four Tower Tech Cooling Towers including: Removal and replacement of tower fill media and drift eliminators Cleaning and sealing of tower basins Upgraded internal water piping distribution and nozzle replacement Installed two 12” and one 16” system strainers to
Hiawatha Light Rail Maintenance Facility
Installed 168 well ground source geothermal heating and cooling system to serve the building Infrared heating system installed throughout the facility Project consisted of a 60,200 SF building addition for allow for maintenance to the light rail trains.
MN Zoo- Russia’s Grizzly Coast
This project consists of two different bodies of water, one salt water and the other fresh water. We employed the use of Titanium heat exchangers to maintain critical water temperatures, high purity water filter system including UV and Ozone generation for sanitizing the water. This system is
Webber Pool
The largest outdoor pool located in Minnesota and the only swimming pool in the United States that utilizes natural ponds as a method of filtering the pool water. There are no chemicals added to the pool water. This project consists of a zero-entry wading pool, lap pool and a diving well. We